Daily SLA Breach Warning

Visible copy: DAILY SLA BREACH WARNING / ELEVATOR STATUS: IN PRODUCTION / THE ELEVATOR REACHED PROD. DAVE’S VM IS STILL IN THE LOBBY. The elevator made production first. The VM remains in the lobby under an increasingly musical SLA clock.

The Elevator Knows Too Much

Visible copy: THE ELEVATOR KNOWS TOO MUCH / WITNESS PROTECTION: FLOOR 13 / CALL BUTTONS PLACED UNDER OATH. / FLOOR 13 DECLINED TO COMMENT. / THE LOBBY HAS RETAINED COUNSEL. Peak Hermanity architecture: a workplace status update filed as evidence in an elevator’s protection case.